FRP Bridge Deck New Construction Cycle Bridge in Berka Werra, Germany
The wooden bridge construction of this cycle bridge in Berka Werra in Germany was at the end of its service life. Municipality of Werra-Suhl-Tal decided not to renovate the cycle bridge and had the wooden structure removed. A new construction of steel with a GRP Bridge deck for this cycle bridge was desired. As the concrete abutments were in good condition, they were reused for the new-build cycle bridge. At about 30m2, this is a relatively small new-build project, but very important. Indeed, this new cycle bridge acts as an important cycle link between two areas along a through road.
-
OpdrachtgeverMunicipality of Werra-Suhl-Tal
-
LocatieBerka Werra, Germany
-
Omvang30 m2
The ease of installation of FRP Bridge Decking in new construction on existing structures
With the 12 innovative installation methods opting for our durable FRP Bridge Decking Planks was an easy choice for the German municipality. Regardless of the material used, our FRP Bridge Decking Planks can be mounted to support structures using reliable connecting devices. The quick installation, durability, non-slip layers and wear-resistant surfaces, low production costs and long service life are compelling reasons for many clients to choose our bridge decking planks.
